Just need to finish the wiring and a few odds n ends.. Posted on September 6, 2013 12:48 pm by Alex Everything in. Last thing to do is wire it, replace the trans pan and some small things here and there. Should be ready to fire up this week! 🙂 📂This entry was posted in Chevy II Nova SBC
November 9, 2013 Alex Upgrading the alternator bracketOriginally I had picked up an alternator bracket because low mount brackets didnt work with either m...
February 18, 2020 Alex SBC Parts for sale!(8) Crower SBC rods. 2.100 journal, 6.125", .927, SPS rod bolts, used but great condition! $350 (8)...